Restoration of the left headrace tunnel of the Zakučac hydropower plant
Based on the project for the restoration of the left headrace tunnel of the Zakučac power plant, the technical solution for the restoration was divided into two basic groups: the first comprised injection work, and the second work on the restoration of the concrete lining . The delivery of concrete was performed during the second phase, when concrete was supplied for 500 metres of the tunnel.