+385 (0) 21 756 835 Vukovarska cesta 8, 21310, Omiš

POWER PLANTS

Lukovac wind farm Lukovac wind farm

Supplying concrete for the project of the Lukovac wind farm in the municipality of Cista Provo. Delivery was made for the foundations of 16 wind turbines, each with a power of 3 MW.
Amount of concrete: 9,400 m³

Zelengrad wind farm Zelengrad wind farm

Supplying concrete for the project of the Zelengrad wind farm on the territory of the town of Obrovac. Delivery was made for the foundations of 14 wind turbines, each with a power of 3 MW.
Amount of concrete: 13,400 m³

Bruška wind farm Bruška wind farm

Supplying concrete for the project of the Bruška wind farm near Benkovac. Delivery was made for the foundations of 16 wind turbines, each with a power of 2.3 MW.
Amount of concrete: 11,000 m³

Danilo wind farm Danilo wind farm

Supplying concrete for the project of the Danilo wind farm near Šibenik. Delivery was made for the foundations of 19 wind turbines, each with a power of 2.3 MW.
Amount of concrete: 10,000 m³

Jelinak wind farm Jelinak wind farm

Supplying concrete for the project of the Jelinak windfarm in the municipalities of Marina and Seget. Delivery was made for the foundations of 20 wind turbines, each with a power of 1.5 MW.
Amount of concrete: 10,000 m³

Kamensko-Voštane wind farm Kamensko-Voštane wind farm

Supplying concrete for the project of the Kamensko-Voštane wind farm on the territory of the town of Trilj. Delivery was made for the foundations of 12 wind turbines, each with a power of 3 MW.
Amount of concrete: 8,000 m³

Orlice wind farm Orlice wind farm

Supplying concrete for the project of the Orlice wind farm near Vrpolje, which was also our first project of supplying concrete for the foundations of wind turbines. Delivery was made for 11 foundations in total (8 with a power of 900 kW and 3 with a power of 800 kW).
Amount of concrete: 5,000 m³

Katuni wind farm Katuni wind farm

Supplying concrete for the project of the Katuni wind farm in the municipality of Šestanovac. Delivery was made for the foundations of 6 wind turbines, each with a power of 3.2 MW.
Amount of concrete: 4,000 m³

Restoration of the left headrace tunnel of the Zakučac hydropower plant Restoration of the left headrace tunnel of the Zakučac hydropower plant

Based on the project for the restoration of the left headrace tunnel of the Zakučac power plant, the technical solution for the restoration was divided into two basic groups: the first comprised injection work, and the second work on the restoration of the concrete lining . The delivery of concrete was performed during the second phase, when concrete was supplied for 500 metres of the tunnel.